Quick
Search: 
 
advanced search
 GSW Home    GeoRef Home    My GSW Alerts    Contact GSW    About GSW    Journals List    Help 
  Petroleum Geoscience   Email Content Delivery
JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS

Petroleum Geoscience; March 2001; v. 7; no. 1; p. 65-73
© 2001 Geological Society of London
This Article
Right arrow Figures Only
Right arrow Full Text
Right arrow Full Text (PDF)
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Griffths, A. E.
Right arrow Articles by Sultanov, P.
Right arrow Search for Related Content

Articles

Increasing production from old, onshore oil fields, Azerbaijan –a case study

A. E. Griffths1, V. R. Begliarbekov2, M. A. Shakbazov2 and P. Sultanov2

1 GeoQuest Reservoir Technologies, Worton Grange, Reading RG2 0TF, UK (present address: Griffn Petroleum Consulting Ltd, Drayton, Oxon OX14 4HT, UK)
2 SOCAR, 73 Neftchilar Avenue, Baku 370004, Azerbaijan

As part of an effort to try to halt the decline in onshore oil production and accelerate production from onshore fields in Azerbaijan, a World Bank-sponsored study of four fields was carried out: the Bibi-Eybat, Kala, Buzovni-Mashtagi and Zirya fields. The study integrated geoscience, engineering, economics and environmental issues. This paper concentrates on the determination of methods for increasing production rates and recovery. The characteristics of the subject fields are summarized and their current status described. Methods for improving oil production rates in the fields include: mechanical work-overs, artificial lift optimization, sand-control and changes to well completion practices. Our work indicates that production rates could be raised between two-and ten-fold through the application of modern oil-field practices, but financial constraints have prevented their widespread use. Well intervention techniques form the basis of several outline field development plans, described with the associated production forecasts. A brief review is made of possible exploration plays which exist in and around the subject fields.

KEYWORDS: Azerbaijan, FSU, Pliocene, depleted reservoir, development







JOURNAL HOME HELP CONTACT PUBLISHER SUBSCRIBE ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2009 by Geological Society of London